Removing a Load-Bearing Wall in Mandurah? Here’s What You May Need for Council Approval

Opening up a kitchen, dining room or living area can make an older home feel brighter, larger and better suited to everyday life. When the wall supports the roof, ceiling, upper floor or another part of the building, however, the alteration requires more planning than a standard interior renovation.
In Mandurah, a load-bearing wall alteration may require assessment and design by a qualified professional, coordinated drawings, building-surveyor review and a building permit before work begins.
Key takeaways
Confirm the building-permit requirements before removing a structural wall.
A structural drafter provides coordinated drafting documentation, and a qualified engineer may need to assess the wall and design the replacement support.
The application may require existing plans, proposed plans, structural details, and supporting compliance documents for approval.
Final drawings should be consistent before they are submitted to the building surveyor or issued to the builder.
Does removing a load-bearing wall require a building permit in Mandurah?
A load-bearing wall removal should be treated as a structural alteration rather than minor cosmetic work.
According to The City of Mandurah, some minor works that may not require a permit include painting, replacing floor coverings and certain repair or maintenance work. Any proposed work falling outside those minor categories will require a building permit.
Before demolition begins, confirm whether your internal wall alteration requires a Mandurah building permit with the City, or a registered building surveyor.
The WA Government also recommends contacting the relevant local government because it assesses the building application and can advise what documents and local requirements apply.
Short answer: Removing a load-bearing wall in Mandurah may require engineering input, structural drawings and a building permit. The requirements should be confirmed before materials are ordered or demolition begins.
What drawings may be required before the wall is removed?
The exact drawing package will depend on the existing home and the scope of the proposed opening. The following documents may form part of the approval and construction package.
1. Existing floor plan
An existing floor plan records the home before any changes are made. It may identify:
The wall proposed for alteration
Adjoining rooms and openings
Relevant dimensions
The relationship between the wall and the broader floor plan
This gives the drafter, consulting engineer, building surveyor and builder a consistent starting point.
2. Proposed floor plan
The proposed plan shows how the home will be arranged after the wall is removed or the opening is widened.
Drawings for an open-plan renovation may show the proposed opening width, revised room layout, and the locations of structural elements specified by the consulting engineer.
The proposed floor plan should agree with the structural drawings. Conflicting measurements or different opening locations across separate drawing sets can create delays during assessment and construction.
3. Structural details
Where engineering design is required, structural drawings may document:
The replacement beam location and span
Posts or supporting walls
Connection details
Support beneath the beam or posts
Relevant footing or slab details
Construction notes and member references
A qualified structural engineer determines the structural solution. The structural drafter then translates the engineer’s requirements into coordinated technical drawings.
In Mandurah, structural drafting service offered by Complete Structural Design focuses on preparing accurate, build-ready documentation and coordinating it with the relevant project professionals. The drafters work with external consulting engineers where certification is required.
4. Plans, specifications and compliance information
The City of Mandurah requires building permit applications to include the relevant plans and specifications. The application may need to include floor plans, building sections and other construction details that clearly show the proposed alteration and how it will comply with the applicable building requirements.
Depending on the project, a building surveyor may request more information where the documentation does not clearly establish:
Which wall is being altered
How wide the opening will be
What will replace the existing support
How the beam will be supported at each end
Whether the structural and architectural plans agree
Whether the details reflect the consulting engineer’s design
Who prepares the drawings and approval documents?
Structural drafterPrepares the existing, proposed and structural drawings using the project information and the engineer’s approved requirements.
Qualified structural engineerAssesses the structural alteration, determines the required support system, completes calculations and provides engineering certification where required.
Building surveyorReviews the plans and compliance documents and may issue the Certificate of Design Compliance for a certified application.
Certified or uncertified application?
For a certified application, a private registered building surveyor assesses the documentation and prepares a Certificate of Design Compliance before the building permit application is submitted.
For an uncertified application, an eligible Class 1 or Class 10 application is lodged for assessment through the City’s building-surveying process.
The correct pathway depends on the building and proposed work. The City or appointed building surveyor can confirm which option applies.
What should you provide before drafting begins?
Supplying clear project information early can help define the scope and reduce avoidable revisions.
For structural drawings for an internal wall alteration, provide as much of the following as possible:
Property address
Existing house or architectural plans
Photographs of both sides of the wall
Approximate wall and opening dimensions
A sketch of the proposed layout
Details of any storey above
Existing structural documents or reports
Builder or building-designer contact details
Relevant previous approvals
Do not remove wall linings, enter an unsafe roof space or begin demolition solely to gather this information.
Common documentation mistakes
Wall-alteration projects can be delayed when:
Demolition starts before the structural requirements are confirmed
A beam is ordered before the engineer completes the design
The drawings do not show how the beam is supported
Architectural and structural dimensions conflict
An outdated drawing revision reaches the builder
Changes are made on site without updating the documentation
Our guide on how accurate structural drawings help prevent construction delays explains how unclear details, conflicting plans and poor revision control can disrupt work and material orders.
How Complete Structural Design can assist
Complete Structural Design prepares the necessary structural drafting and documentation for renovations, extensions and new construction across Mandurah and surrounding areas.
We coordinate project information with homeowners, builders, building designers, building surveyors, and independent qualified structural engineers. If you are planning an internal wall alteration, share your existing plans, photographs, and proposed layout to discuss the drafting documentation required.
Frequently asked questions
Can Complete Structural Design confirm whether a wall is load-bearing?
No. Where a structural assessment is required, it must be completed by an appropriately qualified structural engineer. Complete Structural Design can prepare the associated drafting documentation and incorporate the engineer’s approved requirements into the drawings.
Can Complete Structural Design specify the replacement beam?
No. Beam sizing, connection design, calculations and engineering certification are the responsibility of a qualified structural engineer. Complete Structural Design documents the engineer’s requirements for approval and construction coordination.
Are existing house plans essential?
Existing plans are helpful but may not be available for an older property. Photographs, approximate dimensions, sketches and a clear description of the proposed alteration can provide an initial brief. Additional information may be required before drafting is completed.
Can demolition begin while the permit is being assessed?
Work requiring a building permit should not begin before the permit has been issued. Confirm the applicable requirements with the City of Mandurah or the appointed building surveyor before commencing a structural alteration.
Disclaimer: This article provides general information only. Approval and documentation requirements depend on the property, proposed work and current regulations. Complete Structural Design provides structural drafting and documentation services and works alongside independent qualified structural engineers. It does not provide structural engineering assessments, calculations, design, or certification directly.